Building survey and quantity take-off
Walk the property to confirm actual linear footage, existing post conditions, connection substrate, and phasing constraints — strata surveys routinely find hidden scope.
New Westminster strata railing work often serves older towers in Downtown and Queens Park where balcony guards need replacement. Heritage-adjacent buildings may have additional documentation requirements.
Strata railing work needs documentation, repeatable details, resident coordination, and finishes that handle years of exterior exposure.
New Westminster combines heritage buildings, steep sites, townhomes, and river-adjacent multi-family work.
| Scope | Typical range | Notes |
|---|---|---|
| Small strata repair package | $8,000-$20,000 | Localized replacement or repair |
| Townhome railing program | $25,000-$90,000+ | Depends on unit count and access |
| Balcony guard replacement | $200-$500/linear ft | Material and staging dependent |
Walk the property to confirm actual linear footage, existing post conditions, connection substrate, and phasing constraints — strata surveys routinely find hidden scope.
Provide colour samples, finish specs, and phasing plan to the strata council before fabrication begins; document approval in writing.
Design balcony guard, stair guard, and post base details as standardized repeating units so every unit receives identical steel — powder coat colour match is confirmed before fabrication runs begin.
Fabricate and deliver in phases aligned to the installation schedule so staging areas stay manageable and residents are not locked out of common areas for extended periods.
Install building-by-building or zone-by-zone; document completed sections with photos for council records and warranty files.
1.6 kPa reference value for early planning. Final engineering confirms project-specific assumptions.
moderate exposure. Finish and hardware choices should follow the exact site conditions.
Heritage and multi-family settings can change documentation requirements.
Strata Railings pricing depends on dimensions, railing type, finish, access, and engineering. Current planning ranges on this page run from $8,000-$20,000 depending on scope.
Most strata railings projects run 6–10 weeks from a confirmed order: 1–2 weeks for shop drawings and engineer review, 3–5 weeks in fabrication, and 1–2 weeks for finishing and installation scheduling. New Westminster site access and permit timing can shift that window, so starting the quote early gives the most flexibility.
Floor-to-floor height or linear footage, site photos, any existing drawings, finish preference, and whether a permit has been applied for. For New Westminster's moderate coastal exposure, confirming the hardware specification early avoids changes after shop drawings are approved.
Send drawings, photos, or a rough scope and we will help define the practical next step.